Leading wire forming machine manufacturer specializing in the development of welding technology.
A remote trial should establish whether a proposed process can produce the specified part in its required inspection condition. A short video of one attractive sample cannot answer every question about repeatability, joining or changeover.
Separate a feasibility demonstration from formal acceptance. Agree drawing features, measurement methods, output sequence and operating conditions before shipment. State what the trial will establish and what will remain outside its scope.
Send production-grade wire with identification connecting it to the intended supply. Where payoff matters, discuss whether a coil is needed instead of short straight lengths. A convenient substitute material may make a demonstration easier while weakening its relevance to production.
Include the difficult representative geometry, such as restricted tool access, interacting bends, critical mounting features or challenging welds. Explain why that feature drives the decision. A simpler part may demonstrate basic motion but cannot establish capability for the critical geometry.
Give each sample and drawing a matching identifier. Include units, revision, material, wire size, finish and inspection condition. Clearly distinguish approved references from known defective examples. A physical sample must not silently override drawing dimensions.
Prepare a packing list with item identification, quantity and material form. Agree setup material, trial stock and reserve quantities with the supplier. There is no universal useful shipment weight; it depends on part size, setup, retries and trial duration. Confirm shipment arrangements before dispatch.
Ask for video connecting identified material, setup, production and measured samples. Supplement it with close-ups where needed. Record machine configuration, tooling and program revision relevant to the result.
Agree a measurement table containing sample ID, feature, requirement, tolerance, result, instrument and inspection condition. For welded parts, include final inspection after release and cooling where required. A flat in-fixture part may move after release.
If output is evaluated, distinguish running time from setup and adjustment. State whether handling, welding and inspection are included. Agree consecutive output requirements instead of accepting isolated selected pieces as evidence for a complete run.
Classify each criterion as passed, failed or not evaluated, supported by evidence. Record deviations and substitutions. If material or tooling differed from the plan, explain what the trial actually proves and what must be repeated.
Agree repeat-trial triggers and responsibility for additional material. Decide whether remaining wire and samples will be returned, retained or disposed of. Keep drawings, results, video and decisions together. Send the acceptance brief to Jinchun Machine before asking for a recommendation so the proposed equipment and trial address the same requirements.
Review why representative coil supply matters to the trial. See wire payoff systems.
Use this background to specify cooled welded-part checks. See wire mesh welding deformation.
Discuss the relevant machine configuration and trial scope. See 3D wire forming and welding equipment.