Leading wire forming machine manufacturer specializing in the development of welding technology.
A spring can meet a free-length target and still deliver the wrong force in service. Testing at two specified heights checks two working conditions and permits an interval rate calculation. It does not replace every other requirement on the spring drawing.
Loaded height is the remaining overall spring height under compression. Deflection is the reduction from free length. Confusing them creates an incorrect test even when the instrument is precise. Record both required heights, force limits and any conditioning, loading-direction or dwell requirements.
Identify the sample, material lot and finished processing condition. Confirm whether acceptance follows stress relief, grinding, coating or another operation. Free length is useful context but cannot replace force measurement.
Use a calibrated force and displacement system with suitable capacity and resolution. Check platen alignment, height reference and support method. Inconsistent seating or tipping can change the readings. Use approved guarding and handling; keep hands clear of compression surfaces. Conditioning cycles should follow the specified method rather than an improvised number.
Approach both heights in the same prescribed direction and at the agreed rate. Record the actual force at each height, including dwell where specified. Do not compress beyond the approved limit simply to obtain another point. Repeat selected measurements to identify seating or zero errors before changing production settings.
Let H1 be the higher loaded height and H2 the lower height, with forces F1 and F2. Interval rate k = (F2 − F1) / (H1 − H2). Force in newtons and height in millimeters give N/mm.
Illustrative calculation only: 40 N at 30 mm and 70 N at 20 mm give k = (70 − 40) / (30 − 20) = 3 N/mm. These are teaching values, not Jinchun test results or acceptance limits. This interval rate does not prove linear behavior beyond the two points.
Compare each force with its own specified limit. A spring can have the expected interval rate while both forces are shifted from target. Do not average away individual failures when the specification requires individual compliance.
Record sample ID, drawing revision, free length, test heights, forces, treatment condition and instrument identification. Compare paired samples through finishing if investigating a change. When measurement differences are large, resolve the test method before assuming the coiling process is unstable.
Send the complete force requirements with the spring drawing and wire specification to Jinchun Machine. Ask for a demonstration in the final inspection condition. A machine motion or feed specification does not guarantee finished spring load or fatigue life.
Review related geometry and processing variables when force results change. See spring diameter and pitch variation.
Use this corresponding coiling product as the basis for a sample trial. See CNC compression spring machine.
Related Articles: